Piedmont Lithium Announces Further High-Grade Assay Results

Piedmont at Nasdaq and Wall Street. Photo: Piedmont Lithium LLC

Piedmont Lithium is pleased to report further high grade mineralisation from the 93-hole Phase 2 drilling campaign on the Piedmont Lithium Project ("Project") located within the world-class Carolina Tin-Spodumene Belt ("TSB").  The Phase 2 program totalled 12,262 meters of diamond core drilling in Carolina.

Keith D. Phillips, President and Chief Executive Officer, said, "These additional Phase 2 results continue to showcase the high-grade mineralization throughout our growing land package. We are increasingly confident in our ability to define a large lithium deposit in this historic belt, and we look forward to releasing the remaining results of our Phase 2 drilling campaign over the coming weeks."

  • Assay results from a further 25 holes of the Phase 2 drill program have been received and continue to confirm high grade lithium mineralization along the 4 kilometers of strike within the property including:
    • 25.22m of cumulative thickness of mineralization across 6 pegmatites which includes high grade intercepts of 5.40m @ 1.46% Li2O, 2.65m @ 1.24% Li2O and 2.00m @ 1.43% Li2O in Hole 17-BD-73
    • 21.92m of cumulative thickness of mineralization across 5 pegmatites which includes high grade intercepts of 8.86m @ 1.72% Li2O, and 8.04m @ 1.02% Li2O in Hole 17-BD-80
    • 18.66m of cumulative thickness of mineralization across 6 pegmatites which includes high grade intercepts of 6.27m @ 1.39% Li2O, 4.21m @ 1.83% Li2O, 2.26m @1.52% Li2O and 1.68m @ 1.83% Li2O in Hole 17-BD-64
    • 18.64m of cumulative thickness of mineralization across 6 pegmatites which includes high grade intercepts of 6.66m @ 1.59% Li2O and 2.68m @ 1.58% Li2O in Hole 17-BD-75
    • 14.08m of cumulative thickness of mineralization across 5 pegmatites which includes a high grade intercepts of 5.03m @ 1.98% Li2O and 2.04m @ 1.52% Li2O n Hole 17-BD-70
    • 12.97m of cumulative thickness of mineralization across 2 pegmatites which includes a high grade intercept of 10.36m @ 1.53% Li2O in Hole 17-BD-72
  • Piedmont has now completed the 93-hole Phase 2 diamond drilling program, which totaled 12,262 meters
  • The Company anticipates receiving assay results for the remaining 42 holes of the extended Phase 2 program over the coming weeks

Source: Piedmont